Floodwater Release Bulletin

At 11:00 AM on Monday, June 3:

• Grand Lake elevation was 747.33 feet. Daily target elevation for June 3 is 744.00 feet.
• At the direction of the United States Army Corps of Engineers, nine (9) floodgates were open at Pensacola Dam, discharging 44,886 cubic feet per second (cfs) of water.
• Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,210 cfs of water through generation. Releases through floodgates and generation totaled 58,096 cfs.
• Inflows into Grand Lake totaled 68,031 cfs.

• Lake Hudson elevation was 627.12 feet. Normal elevation is 619 feet.
• At the direction of the United States Army Corps of Engineers, three (3) floodgates were open at Robert S. Kerr Dam, discharging 55,041 cubic feet per second (cfs) of water.
• Three (3) units were online at Robert S. Kerr Dam powerhouse releasing 22,680 cfs of water through generation.
• Releases through floodgates and generation totaled 77,721 cfs.
• Inflows into Lake Hudson totaled 59,945 cfs.

# # #