For immediate release: 9/25/09
Floodwater release bulletin
At 10 AM on Friday, September 25:
- Grand Lake elevation was 746.08 feet. Daily target elevation for September 25 is 741 feet.
- At the direction of the United States Army Corps of Engineers, one (1) floodgate was open at Pensacola Dam, discharging 246 cubic feet per second (cfs) of water.
- Six (6) units were online at the Pensacola Dam powerhouse, releasing 11,882 cfs of water through generation.
- Releases through floodgates and generation totaled 12,128 cfs.
- Inflows into Grand Lake totaled 8,059 cfs.
- Lake Hudson elevation was 621.83 feet. Normal elevation is 619 feet.
- No floodgates were open at Robert S. Kerr Dam.
- Three (3) units were online at Robert S. Kerr Dam powerhouse releasing 22,950 cfs of water through generation.
- Inflows into Lake Hudson totaled 13,296 cfs.
|
|
Contact Information:
Media Services
Justin Alberty
918-256-5545 X 4418
|