|
|
- For immediate release: 10/14/09
Floodwater release bulletin
- At 2PM on Wednesday, October 14:
- Grand Lake elevation was 747.90 feet. Daily target elevation for October 14 is 741 feet.
- At the direction of the United States Army Corps of Engineers, seven (7) floodgates were open at Pensacola Dam, discharging 35,050 cubic feet per second (cfs) of water.
- Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,239 cfs of water through generation.
- Releases through floodgates and generation totaled 48,289 cfs.
- Inflows into Grand Lake totaled 11,798 cfs.
- Lake Hudson elevation was 625.70 feet. Normal elevation is 619 feet.
- At the direction of the United States Army Corps of Engineers, two (2) floodgates were open at Robert S. Kerr Dam, discharging 32,801 cfs of water.
- Three (3) units were online at Robert S. Kerr Dam powerhouse releasing 24,300 cfs of water through generation.
- Releases through floodgates and generation totaled 57,101 cfs.
- Inflows into Lake Hudson totaled 50,205 cfs.
|
|
Contact Information:
Media Services
Justin Alberty
918-256-5545 X 4418
|